The dormitory needed concrete and structural repairs. The SE corner of the dorm was stabilized by removing the currently damaged wall and the footings & floor was replaced. A new wall was built to build plans. This was not a permanent fix, but kept the boys safer from falling in concrete, vermin, and malaria carrying mosquitoes.